Location: St. Paul, Minnesota Client: United and Children's Hospital General Contractor: McGough Construction

United Hospital completed a 192,000 square foot expansion in 2010. Over an 8-month period, ESI monitored vibration due to construction activities, which included earthwork, heavy truck and crane traffic, rock removal, and soil compaction. Two locations on the lower level and two locations on the first level were monitored in the existing United Hospital and attached Children's Hospital.

ESI installed its proprietary vibration monitoring system that provided 1/3 octave rms velocity and peak particle velocity at each location.

Exceedance warnings were sent to stakeholders and
details of the event were saved by the system for follow up analysis.

Browse the project photo gallery below!

Some of our past monitoring projects include:

35W Bridge Construction Vibration

Minneapolis, MN

Smith & Kolthoff Hall Monitoring

University of Minnesota

United Hospital Construction Vibration

St. Paul, Minnesota

Fortune 500 Company Data Center

St. Paul, Minnesota Area

Back to Top